This OSHA Injury Report was compiled directly from data that is publicly available from the Occupational Safety and Health Administration (OSHA). OSHA Injury Reports can be helpful in understanding the types of workplace injury claims involving defective products or malfunctioning equipment in the workplace. 

The manufacturers of defective equipment or machinery resulting in a worker injury may be found to be negligent and liable for damages in a separate civil lawsuit. You may be able to recover damages on top of a workers’ comp claim if injured in a job accident caused, in part, by a third party. These third party personal injury cases should be given responsible legal guidance.

Trammell Piazza Law Firm claims no responsibility for any errors or inconsistencies in OSHA’s data.

A link is provided below to share or embed this report.

Report: Indirect exposure to electricity, greater than 220 volts at Cekra Inc. in Wharton, Texas

DATE: 04/04/17

Two employees were using a manlift to paint the bridge approximately 30 feet above the ground with an identified, energized, electrical power line running parallel to the bridge containing 12,000 volts of electricity. Either the manlift basket made contact with the electrical power line or the power line arched and made contact with the manlift basket resulting in injury to one of the employees. The employee suffered first and third degree electrical burns to his right arm, stomach and back.

Report ID2017043040 
Date04/04/2017 
UPA1198841 
Inspection1223357 
Primary NAICS237310 
Nature1533Third or fourth degree electrical burns
Part of Body899Multiple body parts, n.e.c.
Source3463Manlifts
Secondary Source4415Power lines, transformers, convertors
Event5122Indirect exposure to electricity, greater than 220 volts
Hospitalized Yes 
Amputation No 

If you have any questions or concerns about a specific record or records, please contact us at support@wp-yusgobk23m.pairsite.com.

Embed OSHA Injury Report ID 2017043040: